Backfilling and Compacting. Once the substructure like foundation structures including the solid blocks have been installed completed backfiling and compacting should take place.
Backfilling and compacting should be done partially to make sure that the required degree of compacting has been met until reaching the bottom of the tie beam level.
Here are the some backfilling work, done by Maa kalika infrastructure, in the presence of Civil Engineer Mr. Bhaskar Prasad



