Foundation Bars and Column Starter Bars. Once the laying of PCC has been set up, the TMT bar work for foundation and foundation Beams are the next activity.
In this stage the reinforcement of foundations is being prepared according to the structural drawings along its formworks
.
The proper and standard concrete cover should be observed during this procedure.
the minimum cover for column is 40mm, for beam 25mm, for footing 50mm.
Here are the some column, beam and footing work, done by Maa kalika infrastructure, in the presence of Civil Engineer Mr. Bhaskar Prasad.