Excavation.

Excavation. Once the layouts of the construction points and grid line have been completed, the excavation works begin. The Excavation depth depends on the recommendation by the soil investigation report. But it’s safe to say that the minimum excavation level for the footing to rest should stick to 1 Meter below the ground level.  Excavation […]

Excavation. Read More »

Concreting of Slab.

Concreting of Slab. Once the ground floor columns have been cast it’s time to prepare the project for beams and suspended slab reinforcement activity. Like any other structural members beam and slab reinforcement should be followed strictly. Shuttering or formworks for slab and beam should be properly checked before concrete pouring Here are the slab

Concreting of Slab. Read More »