Compacting and Laying PCC.

Compacting and Laying PCC. Compacting of the excavated surface should perform once we reach the desired excavation level.

A layer of crushed gravel and sand is added during the compaction.

Standard compaction procedure the final compacted layer should be checked in order to reach the desired degree of compaction is not less than 95 % of the maximum dry density.

In this stage we can also add anti termite treatment on the ground to prevent unnecessary insect and other ground insect activity