Excavation. Once the layouts of the construction points and grid line have been completed, the excavation works begin.
The Excavation depth depends on the recommendation by the soil investigation report.
But it’s safe to say that the minimum excavation level for the footing to rest should stick to 1 Meter below the ground level.
Excavation work is a massive activity therefore a proper caution should be observed during this stage.
Here are the some Excavation work done by Maa kalika infrastructure, in the presence of Civil Engineer Mr. Bhaskar Prasad.